Back to Projects
Commercial

EV Chargepoint Installation and Commissioning

Wingham Electrical & Fire delivered the installation and commissioning of new EV chargepoints, providing a robust, efficient and future-ready charging solution tailored to the site’s requirements.

The project began with a detailed site survey and electrical load assessment, allowing the team to design an installation that maximised performance while maintaining full compliance with current regulations.

The complete installation process was managed by the Wingham Electrical & Fire team, including cabling, containment, any necessary distribution upgrades and the seamless integration of the chargepoints into the site’s existing electrical infrastructure.

Smart functionality was also implemented to support efficient energy usage, helping to balance demand and prepare the site for future expansion as electric vehicle adoption continues to grow.

Every aspect of the installation was thoroughly tested and verified to ensure safety, reliability and long-term performance. The result is a clean, professional installation that meets the site’s current charging requirements while providing the flexibility to support future needs.

Planning A Similar Project?

Talk to our team about your site, project or property - commercial or residential, across Kent and the South East.